U1-33 : THRILLER PROJECT 2008/9

Saturday 11 October 2008

Pictures

The path leading up to the house


Further up the path (sorry it's a bit blurry)

Outside house 1

Outside house 1


Inside house 1 (There was another picture however it was to blurey to make out)

Outside house 1

Outside house 2
Inside house 2


Bomb shelter

House one is proberbly the most run down and hardest to film in however has a pretty good, creepy atmosphere. House two though is a lot less run down, we can always film in both and decide which bits to use in editing.
Isaac.

0 Comments:

Post a Comment

<< Home

U1-33 : THRILLER PROJECT 2008/9